«Semser Construction»

– is a reliable partner in the field of design and installation, as well as the supply of equipment for security systems for industrial and civil facilities. The rich experience of the company allows us to note the merits and professionalism of highly qualified specialists who accompany the facility from the design stage to commissioning and warranty service. We are ready to offer turnkey solutions with constant monitoring and technical support, taking into account the wishes of the customer.

Our projects:

1. “Construction of compressor stations Saksaulsk, Aksuat, Shornak, the Beineu-Shymkent gas pipeline.”

2. Installation work of the automatic control system for compressor units “Compressor station Saksaulsk, Aksuat”:
Supply of materials and equipment, installation work and commissioning of active optical communication line equipment for the project.

3. Supply of materials and equipment, installation work and commissioning of a wastewater treatment plant at the Taraz Chemical Park facility. Manufacturing and installation of buildings from light metal structures

4. Supply of shut-off and control valves for the project “Construction of a 110/10 kV substation at the Aman PS.”

5. Design, supply, installation work and commissioning of F&G systems, video surveillance, perimeter security, optical communication line, automatic fire alarm, automatic gas alarm, public address system, automatic gas fire extinguishing system, television system, LAN system for the project “Construction of compressor station 1A- Ustyurt of the Beineu-Shymkent gas pipeline.”

6. Manufacturing and installation work from light metal structures of the gas fire extinguishing station “Compressor station 1A-Ustyurt of the Beineu-Shymkent main gas pipeline.”

7. Supply of materials and equipment, installation work and commissioning of active equipment of the optical communication line for the project “Construction of Compressor Station 1A-Ustyurt of the Beineu-Shymkent gas pipeline”

8. Installation work and commissioning of ventilation and air conditioning systems, dispatching of the “Rotation camp of the compressor station 1A-Ustyurt of the Beineu-Shymkent gas pipeline”

9. Manufacturing and supply of metal structures for the rotation camp “Rotation camp of the compressor station 1A-Ustyurt of the Beineu-Shymkent gas pipeline”

10. Supply, installation work and commissioning of a video surveillance system, active equipment of an optical communication line, automation of production technology, communication system at the Orlik section of the Uzen-Atyrau-Samara oil pipeline F1080mm. Replacement of the pipeline in sections 230-244km, 267-282km, 284-291km, with a total length of 36 km.

11. Supply, installation work and commissioning at the Beineu section of the Uzen-Atyrau-Samara oil pipeline, diameter 1080mm. Replacement of the pipeline in sections 230-244km, 267-282km, 284-291km, with a total length of 36 km.

12. Installation work “Overhead line 110 kV PGTPP – 310 - Kashagan CGTU - total length 64 km”

13. Construction of a “110 kV cable line with a total length of 1.5 km”

14. Construction of the 110/6 kV substation of the Kashagan gas treatment facility

15. Design, supply, installation and commissioning of F&G systems, video surveillance, perimeter security, optical communication line, automatic fire alarm, automatic gas alarm, public address system, automatic gas fire extinguishing system, television system, LAN system for the project “Booster compressor station”

16. Supply, installation work and commissioning of a video surveillance system at the production base in Almaty and Shymkent for Elektrokhimzashchita LLP

17. Design, supply, installation work and commissioning of domestic wastewater treatment plants, sewage pumping stations.

18. Development of design documentation for the project “Construction of a logistics center in Shymkent at the address Shymkent, Karatau district, block 188, school 236 No. 88, building No. 2113” section of the APT system (sprinkler system and internal fire water supply).

19. Design, supply and installation work “Wind Power Plant Badamsha 48 MW”.

20. Design, supply and installation of a video surveillance system, active equipment of an optical communication line, automation of production technology, communication system "MG Sarsha" (Zhetybay - Sea Port "Kuryk")

21. Construction along the 10 kV MG Sarsha highway overhead line (Zhetybay - Kuryk Sea Port) with a total length of 80 km.

22. Reconstruction of 35/6 kV substation Base of LLP "Electro - KHSBM Shymkent"

23. Design, supply and installation of a video surveillance system, active equipment for an optical communication line, automation of production technology, communication systems at the facilities:
- “MP “Uzen-Atyrau-Samara” ø720mm. Replacement of the pipeline in sections 1189-1234 km with a total length of 45 km,”
- "MP "Uzen-Atyrau-Samara" Ф1020mm. Replacement of the pipeline in sections 230-244km, 267-282km, 284-291km, with a total length of 36km"

24. Design, supply, installation and commissioning of communication and data transmission systems, construction of fiber-optic lines. Supply and installation of Siemens equipment for automation and telemechanics systems, video surveillance equipment and security systems, as well as VHF radio communications at the project “Construction of a reserve gas pipeline (Lupinga) Du1020 mm with a length of 130 km (L-130 km)

25. Design, development of SCADA systems, programming of remote control and monitoring systems, communication systems, radio relay communication system at the construction site of the second line of the Astrakhan-Mangyshlak water pipeline.

26. Design, supply, installation and commissioning of communication and data transmission systems, construction of fiber-optic lines. Supply and installation of Siemens equipment for automation and telemechanics systems, video surveillance equipment and security systems, as well as VHF radio communications at the project “Construction of the TIP-04 Kairat jumper between the Kazakhstan-China main gas pipeline and the Almaty-Baiserke-Talgar main gas pipeline.”

27. Design, supply, installation and commissioning of communication and data transmission systems, construction of fiber-optic lines. Supply and installation of Siemens equipment for automation and telemechanics systems, video surveillance equipment and security systems at the project “Construction of AGDS CHPP-3 with gas pipeline branches”